Fleet economics
RipTerra™ Value Calculator.
Model RipTerra™’s impact on your own fleet. Move the sliders – savings per rig, year-5 fleet saving and five-year NPV update instantly.
Modelled figures based on DrillTerra trial data and cost modelling. Detailed model available under NDA. Defaults reproduce the published case: 396,000 m per rig-year (60 m/hr × 6,600 operating hours), $1.51 saved per metre, rigs ramping 4 → 12 → 24 → 36 → 40 over five years, 8% discount rate.
Your fleet, your numbers